Construction work overview:

After the client sign of the schematic plan, the design development phase will start and will address the following tasks:

  • Demolition task and will be expressed in demolition plans and demolition notes.

  • New construction task and will be expressed in the following drawings;

  • Floor plan with detailed cabinets and finishes.

  • Equipment and power plan which can be combined with the floor plan.

  • Ceiling plan if required.

  • Detailed interior elevations for the new areas.

On the following posts we will address each task on more details.

  • Flooring, the extent of demolished floor and the new flooring.

  • Walls to remain, demolished or new one.

  • Cabinets and counter tops to remain, demolished and the new one.

  • New cabinet types.

  • Ceiling, if there is new renovation on the ceiling.

  • Soffits to remain, demolish or new one.

  • Equipment to remain, removed or added ones.

  • Baseboards to remain or removed.

  • Toe-kick heaters to remain, removed or added new ones

  • Electrical Outlets to remain, removed or added new ones.

  • Lighting fixtures to remain, removed or add new ones

  • Moldings to remain, removed or added new one.

  • Painting, paint existing and new walls and ceilings a drawing soffit

  • Doors to remain and if there will be cutting existing doors

  • Window and window trims, to remain or removed or added new ones

  • Wall tiling, existing and new tiles

  • Floor Transition as a result of new flooring

  • Pet Station, as requested.